Andrew Boesch
Project Executive Eastern Exterior Wall Systems
Andrew Boesch has been at EEWS for 11 years, beginning as a Project Engineer, then Project Manager, Project Executive and now Vice President of Preconstruction and Sales. Working on the Operations side of the business, Andrew has been responsible for managing EEWS delivering the design, engineering, fabrication and installation of prefabricated wall systems. Andrew has pivoted to the VP of Preconstruction role to ensure a smooth transition from conceptualized bid designs and estimates into project specific Design Assist deliverables. Andrew continues to refine the Design Assist process to align the project team in delivering seamlessly integrated prefabricated solutions. By executing a clearly defined process, EEWS can ensure the design is developed to maintain the Architect’s Design Intent, while managing the CM’s Budget and Schedule. Andrew’s notable projects include Atrium Health CMC Bed Tower, Rowan University School of Veterinary Medicine, Mohawk Valley Health System Wynn Hospital, Grand View Health Hospital Expansion, Drexel University College of Medicine, University of Pennsylvania – New College House West, Vanguard Neptune Building and American Dream Meadowlands.
Seminars
- Evaluating how different prefabricated structural systems and façades perform across various project types
- Understanding volume thresholds, cost efficiencies, and warranty considerations by system
- Facilitating cross-sector dialogue to help designers select the right system for their project context
- Aligning fabrication schedules with site readiness to avoid delivery bottlenecks, and on-site rework
- Leveraging layout tools and digital scanning to ensure installation accuracy and reduce last-minute adjustments
- Sharing lessons learned from projects where shop-to-site coordination impacted delivery speed and panel integrity